Lee Kennedy Co. was hired early in the planning and development of this new, four-story academic building which also features three levels of below-grade parking. Preconstruction services were important to the project being as the parking levels are well below the water table. The project required a deep excavation with an earth retention system that provided a water cut-off. Our preconstruction department explored various earth retention systems and selected the soil-mix system which was the most compatible for the site and surrounding properties.
The building contains 60,000 s/f of academic,
administrative and instructional space. The new building
houses
the Graduate School of Social Work, the Graduate School of
Library Information Sciences and technology and student services.
The ground-up construction of this project took
place on an aggressive schedule, with overlapping design
and construction activities.
Architect: Goody, Clancy and Associates, Inc.
More information about this project
can be found in the article:
Lee Kennedy Co., Inc. uses Geo Jet Technology to Maximize Efficiency and Minimize Disturbance
|